Semua produk
kata kunci [ mud pump well drilling ] pertandingan 168 Produk.
15KW Drilling Mud Pumps The Ultimate Solution for Your Drilling Requirements
| Outlet Dia: | 76 |
|---|---|
| Combined Efficiency: | 72% |
| Productivity: | 1560 Pieces/Year |
76mm Outlet Dia Drilling Mud Pump with 72% Combined Efficiency and 4.207 1 Ratio for Heavy-Duty Drilling Applications
| Outlet Dia: | 76 |
|---|---|
| Productivity: | 1560 Pieces/Year |
| Ratio: | 4.207:1 |
Bahan Akhir Fluid Chrome Tinggi Pompa Lumpur Tiga Plunger Termasuk API 7 Valve Menyediakan Solusi Sirkulasi Lumpur yang Bertahan
| Maximum Liner Size: | 7 Inches |
|---|---|
| Displacement: | 32-150L/min |
| Max Pressure: | 3500 Psi |
Sistem Daur Ulang Lumpur HDD 2200hp Pompa Lumpur Triplex NB 2200
| Perjalanan: | 177.8 |
|---|---|
| Diameter silinder: | 170 |
| Aliran (L / mnt): | 800-2200 |
Sistem Daur Ulang Lumpur Tiga Silinder Reciprocating 2200hp HDD
| Perjalanan: | 177.8 |
|---|---|
| Diameter silinder: | 170 |
| Aliran (L / mnt): | 800-2200 |
120 Stroke Rating Triple Mud Pump with 5 Inches Discharge Connection for Smooth and Consistent Mud Mixing
| Stroke: | 12 Inches |
|---|---|
| Valve Type: | API 7 |
| Stroke Rating: | 120 |
76mm Outlet Dia Centrifugal Mud Pump with and 72% Combined Efficiency
| Combined Efficiency: | 72% |
|---|---|
| Power: | 15KW |
| Outlet Dia: | 76 |
Pompa Lumpur Tiga-Plunger Dengan Rasio Gir 4,206 dan Diameter Outlet 5-1/8 "Untuk Kebutuhan Pengeboran Tugas Berat
| Perbandingan gigi: | 4.206 |
|---|---|
| Panjang goresan (dalam/mm): | 12″/305 |
| Peringkat stroke SPM: | 120 |
1600(1193)Rating dayaHP kw) 12′′/305 Panjang pukulan Triplex Mud Pump 12′′/305 Inlet dia untuk Operasi Pengeboran Tugas Berat
| Peringkat dayaHP(kw): | 1600(1193) |
|---|---|
| Diameter saluran keluar(dalam): | flensa 5-1/8″ 5000psi |
| Perbandingan gigi: | 4.206 |
Pompa Lumpur Pengeboran Sistem Daur Ulang Lumpur HDD 2200hp
| Perjalanan: | 177.8 |
|---|---|
| Diameter silinder: | 170 |
| Aliran (L / mnt): | 800-2200 |

