logo
Quality Oil And Gas Double Cone Desander For Drilling Rigs factory
Quality Oil And Gas Double Cone Desander For Drilling Rigs factory

Oil And Gas Double Cone Desander For Drilling Rigs

Oil And Gas Double Cone Desander For Drilling Rigs
Basic Properties
Country Of Origin
China
Brand Name
XW
Certificate
ISO9000
PRODUCT MODEL
Double cone desander
Trading Properties
MOQ
1
Payment Method
T/T
Supply Capacity
100
Product Summary

Double cone desander Desander is the second level solid control equipment in drilling operation, which is mainly used to remove harmful solid particles with particle size of 40-74um in drilling fluid. Using the working principle of centrifugal sedimentation, suspended particles can be separated from ...

Product Details
Highlight:

Oil And Gas Double Cone Desander

,

Desander For Drilling Rigs

,

Drilling Rigs Double Cone Desander

Product Description

Double cone desander

Oil And Gas Double Cone Desander For Drilling Rigs
Desander is the second level solid control equipment in drilling operation, which is mainly used to remove harmful solid particles with particle size of 40-74um in drilling fluid. Using the working principle of centrifugal sedimentation, suspended particles can be separated from the liquid under the action of centrifugal acceleration.
At present, there are three types of desander 300 × 2,250 × 2,200 × 2 and 300 × 1,250 × 1,200 × 1. The former is applicable to drilling rigs above 3000 meters, while the latter is applicable to small drilling rigs and workover rigs below 3000 meters. Double cone desander
Desander is the second level solid control equipment in drilling operation, which is mainly used to remove harmful solid particles with particle size of 40-74um in drilling fluid. Using the working principle of centrifugal sedimentation, suspended particles can be separated from the liquid under the action of centrifugal acceleration.
At present, there are three types of desander 300 × 2,250 × 2,200 × 2 and 300 × 1,250 × 1,200 × 1. The former is applicable to drilling rigs above 3000 meters, while the latter is applicable to small drilling rigs and workover rigs below 3000 meters.